Rio East Linear Park – CMAR

 

Completed Section

Existing Condition Overview

This project is adjacent to Town Lake and the Pier at Town Lake Project. The existing area serves as a flood control levee with under-ground gabion mattress. The integrity of existing levee will be preserved.

Proposed Condition

The project consists of:

  • Construction of concrete Truck Ramps
  • Construction of a concrete boardwalk
  • Installation of native plantings and other landscaping and an automatic irrigation system
  • Installation of site lighting and electrical service
  • Installation of storm water drainage piping, storage and treatment system
  • Alterations and repairs/replacement of gabion mattresses damaged during construction
  • Installation of site amenities
  • Coordination with the Army Corps of Engineers lakefront project located between the Pier at Town Lake project and North McClintock Drive; and Maricopa County Flood Control District
  • Coordination with the design team including providing; Construction Cost Estimates & Construction Management
 